Replace 330 MW of CLECO.DPS Unit with solar; Dolet Hills (MISO-R1004) — Project Summary

Queue ID
MISO-R1004
Capacity
330 MW
Technology
Solar
Status
active
Location
De Soto Parish, LA
Region
MISO
Developer
—
IA Status
—

Replace 330 MW of CLECO.DPS Unit with solar; Dolet Hills

MISO-R1004BetaActiveSolarOtherMISOLBNL + Live

330 MW hybrid in De Soto Parish, LA · In queue since December 2020 · Proposed COD December 2024

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

330 MW

Capacity

1

Components

Solar

5y 10m

In Queue

—

IA Status

COD target: 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 years

Schedule

22 months past proposed COD

Pre-Study0%
Queue EntryDec 30, 2020

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-31

Cross-source intelligence
Beta
Low confidence·3 sources·as of 2026-10-25
Expected COD
2024-12-31
From queue filing
Developer
—
Status
Active
Active in the MISO queue (R1004); no public evidence of construction, an executed IA, or commissioning, and the proposed 2024-12-31 COD has lapsed.
Financing
Unannounced
About

MISO-R1004, titled "Replace 330 MW of CLECO.DPS Unit with solar; Dolet Hills," is a proposed solar development project in De Soto Parish, Louisiana. The project has a total capacity of 330 MW and is classified as a hybrid project. Its technology listing includes solar along with an unspecified "other" category, though the only defined component is 330 MW of solar generation. As its title indicates, the project is intended to replace 330 MW of capacity at an existing CLECO unit at Dolet Hills. The associated utility is CLECO Power.

The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, which it entered on December 30, 2020, and its queue status is active. It proposes to interconnect at the Dolet Hills 345 kV substation (Bus #500260) and has requested Network Resource Interconnection Service (NRIS). The proposed commercial operation date was December 31, 2024. The available data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

De Soto Parish

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

CLECO POWER

Entity

MISO

Service Type

NRIS

Point of Interconnection

Dolet Hills 345 kV (Bus #500260)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.