Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1
1,166 MW hybrid in Orange, TX · In queue since August 2020 · Proposed COD May 2026
1,166 MW
Capacity
1
Components
Gas
6y 2m
In Queue
—
IA Status
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 9m
Schedule
5 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-05-31
MISO-R1003 is a proposed natural gas development project in Orange County, Texas, that would replace 1,163.3 MW of generation at Sabine Units 3, 4 and 1 with a 2-on-1 combined cycle gas turbine facility. The project has a total proposed capacity of 1,166 MW. Although it is classified as a hybrid project, with technology listed as gas and "other," its only specified component is 1,166 MW of gas generation. The associated utility is Entergy Texas, Inc. The project is linked to the existing operating Sabine plant (EIA plant ID 3459), with a match confidence of 0.78.
The project is in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-R1003. It entered the queue on August 5, 2020, and its status is active. It has requested Network Resource Interconnection Service (NRIS). The proposed point of interconnection is the Sabine 138 kV and 230 kV substation, at bus numbers 334440, 334431 and 334433. The proposed commercial operation date is May 31, 2026. The provided data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Orange
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY TEXAS, INC.
Entity
MISO
Service Type
NRIS
Point of Interconnection
Sabine 138 & 230 kV (bus #334440, #334431, #334433
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- TEXAS.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- EES.SABINE1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.