Replace 103.1 MW of Heskett Units 1 & 2 with One (1) General Electric synchronous combustion turbine; Heskett 1 & 2
103.1 MW hybrid in Morton, ND · In queue since June 2019 · Proposed COD October 2022
103.1 MW
Capacity
1
Components
Gas
7y 4m
In Queue
—
IA Status
COD target: 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 4m
Schedule
50 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-10-01
The proposed project identified in the MISO interconnection queue as MISO-R1000 would replace 103.1 MW of generating capacity at Heskett Units 1 and 2 with one General Electric synchronous combustion turbine. The development project is located in Morton County, North Dakota, and is associated with Montana-Dakota Utilities Co. It is classified as a gas-fired project with a total capacity of 103.1 MW. The queue data lists its technology as both gas and "other" and categorizes it as a hybrid, although the only component listed is 103.1 MW of gas generation.
The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on June 24, 2019, and remains in active status. It has requested Network Resource Interconnection Service (NRIS), with the point of interconnection at the R.M. Heskett Station. The proposed commercial operation date was October 1, 2022. The available data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
ND
County
Morton
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
MONTANA-DAKOTA UTILITIES CO.
Entity
MISO
Service Type
NRIS
Point of Interconnection
R.M. Heskett Station
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Replace 103.1 MW of Heskett Units 1 & 2 with One (1) General Electric synchronous combustion turbine; Heskett 1 & 2Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.