200 MW generation in Gratiot, MI · In queue since March 2018 · Proposed COD June 2021
200 MW
Capacity
1
Components
Wind
8y 7m
In Queue
Construction
IA Phase
Signed May 2021
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 2m
IA → COD
1 month
Total Duration
3y 2m
Schedule
66 months past proposed COD
Study Phase
DPP-2018-APR East (ITC)
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Done; post-GIA Under Construction; GIA
Project under construction
Typical: 18–36 months
Proposed COD: 2021-06-01
MISO-J984 is a proposed 200 MW wind generation project in Gratiot County, Michigan. The project consists of a single wind component and is planned to interconnect at a point on the Nelson Road–Murphy 345 kV transmission line in the service territory of the Michigan Electric Transmission Company (METC). No developer or project name is identified in the available queue data.
The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on March 12, 2018, and was studied in the DPP-2018-APR East (ITC) cycle of MISO's Definitive Planning Phase. It requested Network Resource Interconnection Service (NRIS). An interconnection agreement was executed on May 7, 2021, and the project's IA status is listed as "Construction." Its proposed commercial operation date was June 1, 2021. The project remains active in the MISO queue.
Generated from interconnection queue and public data sources
Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MI
County
Gratiot
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
METC
Entity
MISO
Service Type
NRIS
Point of Interconnection
Nelson Road – Murphy 345kV line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MICHIGAN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MISO-J984Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.