Project MISO-J866 — Project Summary

Queue ID
MISO-J866
Capacity
200 MW
Technology
Wind
Status
active
Location
Tunica, MS
Region
MISO
Developer
—
IA Status
Construction

MISO-J866

MISO-J866BetaActiveWindMISOLBNL + Live

200 MW generation in Tunica, MS · In queue since June 2017 · Proposed COD March 2020

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

200 MW

Capacity

1

Components

Wind

9y 4m

In Queue

Construction

IA Phase

Signed Apr 2020

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 10m

Total Duration

2y 10m

Schedule

80 months past proposed COD

Study Phase

DPP-2017-AUG South

Construction38%
Queue EntryJun 16, 2017

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementApr 6, 2020

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Done; post-GIA Under Construction; GIA

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2020-03-30

About

MISO-J866 is a proposed 200 MW wind generation project located in Tunica County, Mississippi, within the Midcontinent Independent System Operator (MISO) region. The project consists of a single wind component totaling 200 MW and is situated in the service territory of Entergy. No developer has been identified in the available data. The project would interconnect at the Batesville–Robert E. Ritchie 230 kV transmission line and has requested Network Resource Interconnection Service (NRIS).

The project entered the MISO interconnection queue on June 16, 2017, and was studied as part of the DPP-2017-AUG South study cycle. Its proposed commercial operation date was March 30, 2020. The project's interconnection agreement status is listed as "Construction," with an interconnection agreement date of April 6, 2020. As of the most recent data, the project remains active in the queue.

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

MS

County

Tunica

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

Entergy

Entity

MISO

Service Type

NRIS

Point of Interconnection

Batesville - Robert E. Ritchie 230 kV line

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
HIGH
POI Substation
Batesville

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J866
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.