Project MISO-J859 — Project Summary

Queue ID
MISO-J859
Capacity
149.94 MW
Technology
Solar
Status
active
Location
Cass, IL
Region
MISO
Developer
—
IA Status
Construction

MISO-J859

MISO-J859BetaActiveSolarMISOLBNL + Live

149.94 MW generation in Cass, IL · In queue since June 2017 · Proposed COD September 2019

BA: PJMISO/RTO: MISONERC: SERCRC: MISO

149.94 MW

Capacity

1

Components

Solar

9y 4m

In Queue

Construction

IA Phase

Signed Jan 2020

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 7m

Total Duration

2y 7m

Schedule

87 months past proposed COD

Study Phase

DPP-2017-AUG Central

Construction38%
Queue EntryJun 16, 2017

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementJan 23, 2020

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Done; post-GIA Under Construction; GIA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2019-09-01

About

MISO-J859 is a proposed 149.94 MW solar generation project located in Cass County, Illinois. The development project is a standalone solar facility with no storage or other hybrid components. It is situated within the service territory of Ameren Illinois and proposes to connect to the transmission system at the Frederick North – Meredosia East 138 kV line. The project has requested Network Resource Interconnection Service (NRIS), and no developer or project name has been publicly identified in the queue data.

The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on June 16, 2017, and was studied as part of the DPP-2017-AUG Central study cycle. Its interconnection agreement was executed on January 23, 2020, and the agreement status is listed as "Construction." The project's proposed commercial operation date was September 1, 2019, which predates the agreement execution. As of the latest available data, MISO-J859 remains active in the MISO queue.

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

IL

County

Cass

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

AMEREN ILLINOIS

Entity

MISO

Service Type

NRIS

Point of Interconnection

Frederick North - Meredosia East 138kV Line

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J859
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.