MISO-J805
199 MW generation in Shelby, IN · In queue since June 2017 · Proposed COD September 2019
199 MW
Capacity
1
Components
Solar
9y 4m
In Queue
Construction
IA Phase
Signed May 2020
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 11m
Total Duration
2y 11m
Schedule
87 months past proposed COD
Study Phase
DPP-2017-AUG Central
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Done; post-GIA Under Construction; GIA
Project under construction
Typical: 12–24 months
Proposed COD: 2019-09-01
MISO-J805 is a proposed 199 MW solar generation project located in Shelby County, Indiana. The development project is entirely solar, with a single 199 MW solar component, and is associated with the service territory of Duke Energy Corporation. No developer or project name has been publicly identified in the available queue data. The project would connect to the grid at the Gwynneville 345kV Substation and has requested Network Resource Interconnection Service (NRIS).
The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on June 16, 2017, and was studied as part of the DPP-2017-AUG Central study cycle. Its queue status is listed as active. The original proposed commercial operation date was September 1, 2019, a date that has since passed. An interconnection agreement was executed on May 8, 2020, and the agreement status is recorded as "Construction."
Generated from interconnection queue and public data sources
Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
Shelby
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
Duke Energy Corporation
Entity
MISO
Service Type
NRIS
Point of Interconnection
Gwynneville 345kV Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- INDIANA.HUB
- Hub Confidence
- HIGH
- POI Substation
- Gwynneville Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MISO-J805Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.