MISO-J646
1.6 MW generation in Macomb, MI · In queue since June 2016 · Proposed COD July 2010
1.6 MW
Capacity
1
Components
Other
10y 4m
In Queue
Construction
IA Phase
Signed Apr 2019
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 10m
Total Duration
2y 10m
Schedule
199 months past proposed COD
Study Phase
DPP-2017-FEB East (ITC)
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Done; post-GIA Under Construction; GIA
Project under construction
Typical: 12–36 months
Proposed COD: 2010-07-01
MISO-J646 is a proposed 1.6 MW generation project located in Macomb County, Michigan. The project is classified under the "Other" technology category, with a single component of 1.6 MW, and no developer is identified in the available data. The listed utility is ITC Midwest, and the point of interconnection is described as "Carbon - connecting to ITC at Jewel, St-Clair and Spokane substations." The project is seeking Energy Resource Interconnection Service (ERIS).
The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on June 16, 2016, and holds active status. It was studied in the DPP-2017-FEB East (ITC) study cycle. An interconnection agreement was executed on April 26, 2019, and the agreement status is listed as "Construction." The proposed commercial operation date in the queue record is July 1, 2010, which precedes the queue entry date.
Generated from interconnection queue and public data sources
Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MI
County
Macomb
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ITC MIDWEST
Entity
MISO
Service Type
ERIS
Point of Interconnection
Carbon - connecting to ITC at Jewel, St-Clair and Spokane substations
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MICHIGAN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.