Project MISO-J4286 — Project Summary

Queue ID
MISO-J4286
Capacity
770 MW
Technology
Other
Status
active
Location
—
Region
MISO
Developer
—
IA Status
—

MISO-J4286

MISO-J4286BetaActiveMISOLive · MISO

770 MW generation in — · In queue since August 2026 · Proposed COD May 2030

ISO/RTO: MISO

770 MW

Capacity

0

Components

2 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntryAug 29, 2026

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-05-31

About

MISO-J4286 is a proposed generation project in the Midcontinent Independent System Operator (MISO) interconnection queue with a total capacity of 770 MW. Its technology is listed as "Other" in the queue data. The project is associated with Entergy Mississippi, LLC as the interconnecting utility. The available data does not identify a specific county, state, or developer for the proposed project.

The project entered the MISO queue on August 29, 2026, and is in active status. It has requested Network Resource Interconnection Service (NRIS), the service type that allows a generator to be designated as a network resource for serving load. The proposed commercial operation date is May 31, 2030. The available data does not report the status of an interconnection agreement, a link to an existing operating plant, or any news coverage of the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

—

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY MISSISSIPPI, LLC. EMTO

Entity

MISO

Service Type

NRIS

Data Source

Live · MISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J4286
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.