Project MISO-J4214 — Project Summary

Queue ID
MISO-J4214
Capacity
500 MW
Technology
Other
Status
active
Location
—
Region
MISO
Developer
—
IA Status
—

MISO-J4214

MISO-J4214BetaActiveMISOLive · MISO

500 MW generation in — · In queue since February 2026 · Proposed COD June 2031

ISO/RTO: MISO

500 MW

Capacity

0

Components

8 months

In Queue

—

IA Status

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 4m

Pre-Study0%
Queue EntryFeb 18, 2026

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-06-30

About

MISO-J4214 is a proposed 500 MW generation project in the interconnection queue of the Midcontinent Independent System Operator (MISO). The project's technology is listed as "Other" in queue records. The interconnecting utility is Entergy Arkansas, LLC. The available data does not identify a developer, a specific county, or a project name, so the project is referred to by its queue identifier.

The project entered the MISO queue on February 18, 2026, and currently holds an active status. It has requested Network Resource Interconnection Service (NRIS), which would allow its output to serve network load across the MISO system. The proposed commercial operation date is June 30, 2031. Queue records do not report the status of an interconnection agreement. The project has no match to an existing operating plant in U.S. Energy Information Administration data, and no recent news coverage of it has been identified.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

—

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY ARKANSAS, LLC

Entity

MISO

Service Type

NRIS

Data Source

Live · MISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J4214
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.