Project MISO-J3982 — Project Summary

Queue ID
MISO-J3982
Capacity
319.5 MW
Technology
Wind
Status
active
Location
Lonoke, AR
Region
MISO
Developer
—
IA Status
—

MISO-J3982

MISO-J3982BetaActiveWindMISOLBNL + Live

319.5 MW generation in Lonoke, AR · In queue since December 2024 · Proposed COD April 2030

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

319.5 MW

Capacity

1

Components

Wind

1y 11m

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 4m

Study Phase

DPP Cycle Pending South

Pre-Study0%
Queue EntryDec 24, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-04-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

MISO-J3982 is a proposed 319.5 MW wind generation project located in Lonoke County, Arkansas. The development project is listed in the interconnection queue of the Midcontinent Independent System Operator (MISO), with Entergy Arkansas identified as the interconnecting utility. No developer or project name is listed in the queue data. The project would connect to the transmission system at the West Memphis EHV – Keo EHV 500 kV line and has requested Network Resource Interconnection Service (NRIS).

The project entered the MISO queue on December 24, 2024, and its status is currently active. It is in the "DPP Cycle Pending South" study phase, meaning it is awaiting study within MISO's Definitive Planning Phase process for the South region. The queue data does not report an executed interconnection agreement. The proposed commercial operation date is April 1, 2030.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • MISO queue source as of: Oct 25, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AR

County

Lonoke

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY ARKANSAS

Entity

MISO

Service Type

NRIS

Point of Interconnection

WEST MEMPHIS EHV - KEO EHV 500.0kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ARKANSAS.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.