Project MISO-J3353 — Project Summary

Queue ID
MISO-J3353
Capacity
191.3 MW
Technology
Solar
Status
active
Location
Champaign, IL
Region
MISO
Developer
—
IA Status
In Progress (unknown study)

MISO-J3353

MISO-J3353BetaActiveSolarMISOLBNL + Live

191.3 MW generation in Champaign, IL · In queue since April 2024 · Proposed COD August 2028

BA: PJMISO/RTO: MISONERC: SERCRC: MISO

191.3 MW

Capacity

1

Components

Solar

2y 6m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 4m

Study Phase

DPP-2023 Central

In Study38%
Queue EntryApr 18, 2024

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

Active; Phase 2

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-08-01

About

MISO-J3353 is a proposed 191.3 MW solar generation project located in Champaign County, Illinois. The development project consists of a single solar component and is seeking interconnection within the Midcontinent Independent System Operator (MISO) region. The interconnecting transmission owner is Ameren Transmission Company of Illinois, and the project's designated point of interconnection is the Rising substation. No developer name or project name is identified in the available queue data.

The project entered the MISO interconnection queue on April 18, 2024, and its status remains active. It is being evaluated as part of MISO's DPP-2023 Central study cycle and has requested Energy Resource Interconnection Service (ERIS). Its interconnection agreement status is listed as in progress, with the specific study stage unspecified. The project has a proposed commercial operation date of August 1, 2028.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

Champaign

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

AMEREN TRANSMISSION COMPANY OF ILLINOIS

Entity

MISO

Service Type

ERIS

Point of Interconnection

Rising

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
HIGH
POI Substation
Rising Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J3353
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.