MISO-J2478
700 MW generation in Craighead, AR · In queue since September 2022 · Proposed COD October 2026
700 MW
Capacity
1
Components
Solar
3y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-10-31
MISO-J2478 is a proposed solar generation project located in Craighead County, Arkansas, within the Midcontinent Independent System Operator (MISO) region. The project, with a total capacity of 700 MW, is being developed by an unknown entity and is interconnected with Entergy Arkansas. The project entered the MISO interconnection queue on September 14, 2022, with a proposed commercial operation date of October 31, 2026.
The interconnection agreement (IA) status for MISO-J2478 is currently "In Progress (unknown study)". The point of interconnection (POI) is the INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
AR
County
Craighead
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY ARKANSAS
Entity
MISO
Service Type
—
Point of Interconnection
INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV
Data Source
LBNL + Live
- ISO / RTO
- MISO
- Trading Hub
- ARKANSAS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.