Project MISO-J2298 — Project Summary

Queue ID
MISO-J2298
Capacity
200 MW
Technology
Solar
Status
active
Location
Greene, AR
Region
MISO
Developer
—
IA Status
IA Pending

MISO-J2298

MISO-J2298BetaActiveSolarMISOLBNL + Live

200 MW generation in Greene, AR · In queue since November 2021 · Proposed COD April 2025

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

200 MW

Capacity

1

Components

Solar

4y 11m

In Queue

IA Pending

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 1m

Total Duration

4y 1m

Schedule

19 months past proposed COD

Study Phase

DPP-2021 South

Construction38%
Queue EntryNov 30, 2021

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementDec 12, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Done; post-GIA Not Started; Phase 3

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2025-04-01

About

MISO-J2298 is a proposed 200 MW solar generation project located in Greene County, Arkansas. The development project would interconnect at the Gainesville Switching Station within the transmission system associated with Arkansas Electric Cooperative Corporation. The project consists of a single solar component with a capacity of 200 MW and has requested Network Resource Interconnection Service (NRIS). No developer has been publicly identified in the interconnection queue data.

The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on November 30, 2021, and remains in active status. It is being evaluated as part of the DPP-2021 South study cycle. Its interconnection agreement (IA) status is listed as pending, with an associated IA date of December 12, 2025. The project's proposed commercial operation date was April 1, 2025, a date that precedes the listed IA date.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AR

County

Greene

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ARKANSAS ELECTRIC COOPERATIVE CORPORATION

Entity

MISO

Service Type

NRIS

Point of Interconnection

Gainesville Switching Station

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ARKANSAS.HUB
Hub Confidence
HIGH
POI Substation
Gainesville Substation #2

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J2298
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.