Project MISO-J2292 — Project Summary

Queue ID
MISO-J2292
Capacity
50 MW
Technology
Solar
Status
active
Location
Calcasieu Parish, LA
Region
MISO
Developer
—
IA Status
IA Pending

MISO-J2292

MISO-J2292BetaActiveSolarMISOLBNL + Live

50 MW generation in Calcasieu Parish, LA · In queue since September 2021 · Proposed COD September 2024

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

50 MW

Capacity

1

Components

Solar

5y 1m

In Queue

IA Pending

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 3m

Total Duration

4y 3m

Schedule

26 months past proposed COD

Study Phase

DPP-2021 South

Construction38%
Queue EntrySep 15, 2021

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementDec 8, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Done; post-GIA Not Started; Phase 3

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2024-09-01

About

MISO-J2292 is a proposed 50 MW solar generation project located in Calcasieu Parish, Louisiana. The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO). It would connect to the transmission system of Entergy Louisiana at the Goos Ferry point of interconnection. No developer or project name has been publicly identified in the queue data. The project has requested Network Resource Interconnection Service (NRIS).

The project entered the MISO queue on September 15, 2021, and is being studied in the DPP-2021 South cycle of MISO's Definitive Planning Phase. Its status remains active. The proposed commercial operation date was September 1, 2024, which has already passed without the project reaching operation. Its interconnection agreement is listed as pending, with an associated IA date of December 8, 2025.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

Calcasieu Parish

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY LOUISIANA

Entity

MISO

Service Type

NRIS

Point of Interconnection

GOOS FERRY

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J2292
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.