Project MISO-J2133 — Project Summary

Queue ID
MISO-J2133
Capacity
100 MW
Technology
Solar+Battery
Status
active
Location
White, AR
Region
MISO
Developer
—
IA Status
IA Pending

MISO-J2133

MISO-J2133BetaActiveSolarBatteryMISOLBNL + Live

100 MW hybrid in White, AR · In queue since August 2021 · Proposed COD April 2024

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

100 MW

Capacity

1

Components

Solar

5y 2m

In Queue

IA Pending

IA Phase

COD target: 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 8m

Schedule

31 months past proposed COD

Study Phase

DPP-2021 South

In Study38%
Queue EntryAug 26, 2021

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

Done; post-GIA Not Started; Phase 3

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-04-15

About

MISO-J2133 is a proposed hybrid solar and battery storage development project located in White County, Arkansas. The project has a total capacity of 100 MW and pairs solar generation with battery storage. The listed component data specifies 100 MW of solar capacity, and no separate capacity figure is provided for the battery component. The project would interconnect at the Garner 115 kV Substation within the Entergy Arkansas service territory.

The project is listed as active in the Midcontinent Independent System Operator (MISO) interconnection queue, which it entered on August 26, 2021. It is being studied in the DPP-2021 South study phase and has requested Network Resource Interconnection Service (NRIS). Its interconnection agreement status is listed as IA Pending. The proposed commercial operation date is April 15, 2024. That date has passed while the project remains in the queue without an executed interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AR

County

White

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY ARKANSAS

Entity

MISO

Service Type

NRIS

Point of Interconnection

Garner 115 kV Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ARKANSAS.HUB
Hub Confidence
HIGH
POI Substation
Garner Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J2133
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.