MISO-J1897
500 MW hybrid in Mississippi, AR · In queue since December 2021 · Proposed COD August 2024
500 MW
Capacity
1
Components
Solar
4y 10m
In Queue
IA Pending
IA Phase
Signed Dec 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4 years
Total Duration
4 years
Schedule
27 months past proposed COD
Study Phase
DPP-2021 South
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Done; post-GIA Not Started; Phase 3
Project under construction
Typical: 18–30 months
Proposed COD: 2024-08-15
MISO-J1897 is a proposed solar and battery storage hybrid development project located in Mississippi County, Arkansas. The project has a total capacity of 500 MW. Its listed component is a 500 MW solar facility, and a battery storage element is included as part of the hybrid configuration. The project is located within the service territory of Entergy Arkansas. It would interconnect at the Dell EHV – San Souci 500.0 kV point of interconnection.
The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, which it entered on December 14, 2021, and its status is active. It is being studied in the DPP-2021 South study cycle and has requested Network Resource Interconnection Service (NRIS). The proposed commercial operation date was August 15, 2024. The interconnection agreement (IA) is listed as pending, with an associated IA date of December 8, 2025.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
AR
County
Mississippi
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY ARKANSAS
Entity
MISO
Service Type
NRIS
Point of Interconnection
DELL EHV - SAN SOUCI 500.0kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- ARKANSAS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MISO-J1897Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.