Project MISO-J1891 — Project Summary

Queue ID
MISO-J1891
Capacity
200 MW
Technology
Solar+Battery
Status
active
Location
Attala, MS
Region
MISO
Developer
—
IA Status
IA Pending

MISO-J1891

MISO-J1891BetaActiveSolarBatteryMISOLBNL + Live

200 MW hybrid in Attala, MS · In queue since August 2021 · Proposed COD October 2024

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

200 MW

Capacity

1

Components

Solar

5y 2m

In Queue

IA Pending

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 4m

Total Duration

4y 4m

Schedule

24 months past proposed COD

Study Phase

DPP-2021 South

Construction38%
Queue EntryAug 19, 2021

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementDec 5, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Done; post-GIA Not Started; Phase 3

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2024-10-31

About

MISO-J1891 is a proposed solar and battery storage hybrid development project located in Attala County, Mississippi. The project has a total capacity of 200 MW, with the solar component listed at 200 MW. A separate capacity figure for the battery component is not specified. The project would interconnect at the 230 kV McAdams Substation within the service territory of Entergy Mississippi, LLC. It has requested Network Resource Interconnection Service (NRIS).

The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on August 19, 2021. It is being evaluated in the DPP-2021 South study phase. Its queue status is active, and its interconnection agreement (IA) is listed as pending, with an associated IA date of December 5, 2025. The proposed commercial operation date is October 31, 2024, a date that precedes the pending IA milestone. No developer has been publicly identified in the queue data.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MS

County

Attala

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY MISSISSIPPI, LLC.

Entity

MISO

Service Type

NRIS

Point of Interconnection

230 kV McAdams Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
HIGH
POI Substation
McAdams Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J1891
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.