340.3 MW generation in Macon, IL · In queue since June 2020 · Proposed COD January 2027
340.3 MW
Capacity
1
Components
Gas
6y 4m
In Queue
IA Pending
IA Phase
Signed Jun 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
5 years
IA → COD
1y 7m
Total Duration
5 years
Study Phase
DPP-2020 Central
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Done; post-GIA Not Started; GIA
Project under construction
Typical: 24–48 months
Proposed COD: 2027-01-01
MISO-J1839 is a proposed 340.3 MW natural gas-fired generation project located in Macon County, Illinois. The development project is listed in the interconnection queue of the Midcontinent Independent System Operator (MISO). It would connect to the transmission system at the Decatur ADM North 138 kV point of interconnection, within the service territory of Ameren Illinois. No developer or project name has been publicly identified in the queue data.
The project entered the MISO queue on June 25, 2020, and is being evaluated in the DPP-2020 Central study phase. It has requested Network Resource Interconnection Service (NRIS). As of the most recent data, the project holds an active status, with its interconnection agreement listed as pending and an associated IA date of June 16, 2025. The proposed commercial operation date is January 1, 2027.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Macon
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
NRIS
Point of Interconnection
Decatur ADM North 138 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.