Project MISO-J1834 — Project Summary

Queue ID
MISO-J1834
Capacity
126 MW
Technology
Gas
Status
active
Location
Orange, TX
Region
MISO
Developer
—
IA Status
IA Pending

MISO-J1834

MISO-J1834BetaActiveGasMISOLBNL + Live

126 MW generation in Orange, TX · In queue since December 2021 · Proposed COD April 2025

BA: ERCOISO/RTO: MISONERC: TRERC: ERCOT

126 MW

Capacity

1

Components

Gas

4y 10m

In Queue

IA Pending

IA Phase

Signed Feb 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 2m

IA → COD

1y 2m

Total Duration

2y 2m

Schedule

18 months past proposed COD

Study Phase

DPP-2020 South

Construction38%
Queue EntryDec 16, 2021

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementFeb 21, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Done; post-GIA Not Started; GIA

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2025-04-25

About

MISO-J1834 is a proposed 126 MW natural gas-fired generation project located in Orange County, Texas. The development project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), with Entergy Texas, Inc. as the associated transmission utility. The project proposes to interconnect at the Sabine 138/230 kV Substation and has requested Network Resource Interconnection Service (NRIS). No developer or project name has been publicly identified in the queue data.

The project entered the MISO queue on December 16, 2021, and remains in active status. It is being evaluated as part of the DPP-2020 South study phase. Its interconnection agreement (IA) is listed as pending, with an associated IA date of February 21, 2024. The proposed commercial operation date is April 25, 2025.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Orange

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY TEXAS, INC.

Entity

MISO

Service Type

NRIS

Point of Interconnection

Sabine 138/230 kV Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
TEXAS.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J1834
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.