Project MISO-J1752 — Project Summary

Queue ID
MISO-J1752
Capacity
148.1 MW
Technology
Solar
Status
active
Location
Portage, WI
Region
MISO
Developer
—
IA Status
Construction

MISO-J1752

MISO-J1752BetaActiveSolarMISOLBNL + Live

148.1 MW generation in Portage, WI · In queue since May 2022 · Proposed COD August 2023

BA: MISOISO/RTO: MISONERC: MRORC: MISO

148.1 MW

Capacity

1

Components

Solar

4y 5m

In Queue

Construction

IA Phase

Signed Nov 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 6m

Total Duration

2y 6m

Schedule

39 months past proposed COD

Study Phase

DPP-2020 East (ATC)

Construction38%
Queue EntryMay 6, 2022

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementNov 1, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Done; post-GIA Under Construction; GIA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2023-08-01

About

MISO-J1752 is a proposed 148.1 MW solar generation project located in Portage County, Wisconsin. The development project is listed in the interconnection queue of the Midcontinent Independent System Operator (MISO), with American Transmission Company as the interconnecting transmission utility. The project consists of a single solar component of 148.1 MW and has requested Network Resource Interconnection Service (NRIS). Its proposed point of interconnection is the Golden Sands – Arnott (O-119) transmission facility.

The project entered the MISO queue on May 6, 2022, and was studied as part of the DPP-2020 East (ATC) study phase. It remains in active status. The project's interconnection agreement status is listed as "Construction," with an agreement date of November 1, 2024. The proposed commercial operation date was August 1, 2023, which predates both the listed interconnection agreement date and the project's current status.

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

WI

County

Portage

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

AMERICAN TRANSMISSION COMPANY

Entity

MISO

Service Type

NRIS

Point of Interconnection

Golden Sands - Arnott (O-119)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
HIGH
POI Substation
Golden Sands

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J1752
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.