MISO-J1714
100 MW generation in Fayette, IL · In queue since June 2020 · Proposed COD September 2023
100 MW
Capacity
1
Components
Solar
6y 4m
In Queue
IA Pending
IA Phase
Signed Nov 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
5y 5m
Total Duration
5y 5m
Schedule
38 months past proposed COD
Study Phase
DPP-2020 Central
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Done; post-GIA Not Started; GIA
Project under construction
Typical: 12–24 months
Proposed COD: 2023-09-01
MISO-J1714 is a proposed 100 MW solar development project located in Fayette County, Illinois. The project is a standalone solar generation facility with a single 100 MW solar component. It would interconnect within the service territory of Ameren Illinois at the Ramsey East 138kV Substation, which serves as its designated point of interconnection. The project has requested Network Resource Interconnection Service (NRIS).
The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on June 25, 2020, and is currently listed with an active status. It is being evaluated in the DPP-2020 Central study phase of MISO's Definitive Planning Phase process. The project's proposed commercial operation date was September 1, 2023, a date that has since passed. Its interconnection agreement status is listed as "IA Pending," with an associated IA date of November 13, 2025.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Fayette
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
NRIS
Point of Interconnection
Ramsey East 138kV Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- HIGH
- POI Substation
- Ramsey
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MISO-J1714Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.