Project MISO-J1559 — Project Summary

Queue ID
MISO-J1559
Capacity
200 MW
Technology
Solar
Status
active
Location
Conway, AR
Region
MISO
Developer
—
IA Status
Construction

MISO-J1559

MISO-J1559BetaActiveSolarMISOLBNL + Live

200 MW generation in Conway, AR · In queue since June 2020 · Proposed COD April 2023

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

200 MW

Capacity

1

Components

Solar

6y 4m

In Queue

Construction

IA Phase

COD target: 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 10m

Schedule

43 months past proposed COD

Study Phase

DPP-2020 South

In Study38%
Queue EntryJun 18, 2020

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

Done; post-GIA Under Construction; GIA

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-04-01

About

MISO-J1559 is a proposed 200 MW solar generation project located in Conway County, Arkansas. The development project would interconnect to the transmission system at the Morrilton East Substation on the 161 kV bus, within the service territory of Entergy Arkansas. No developer or project name is identified in the available queue data. The project consists of a single solar component with a capacity of 200 MW.

The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on June 18, 2020, and was studied as part of the DPP-2020 South cycle. It requested Network Resource Interconnection Service (NRIS). The project's proposed commercial operation date was April 1, 2023. Its queue status is listed as active, and its interconnection agreement status is recorded as "Construction."

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

AR

County

Conway

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY ARKANSAS

Entity

MISO

Service Type

NRIS

Point of Interconnection

Morrilton East Substation (161kV bus)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ARKANSAS.HUB
Hub Confidence
HIGH
POI Substation
Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J1559