Project MISO-J1528 — Project Summary

Queue ID
MISO-J1528
Capacity
—
Technology
Battery
Status
active
Location
Dunn, WI
Region
MISO
Developer
—
IA Status
—

MISO-J1528

MISO-J1528BetaActiveBattery StorageMISOLive · MISO

— storage in Dunn, WI · In queue since March 2022 · Proposed COD June 2024

BA: MISOISO/RTO: MISONERC: MRORC: MISO

—

Capacity

0

Components

4y 7m

In Queue

—

IA Status

COD target: 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 3m

Schedule

29 months past proposed COD

Study Phase

GIA

Pre-Study0%
Queue EntryMar 17, 2022

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-06-06

About

MISO-J1528 is a proposed battery energy storage development project located in Dunn County, Wisconsin. The project is listed in the interconnection queue of the Midcontinent Independent System Operator (MISO), with Northern States Power Company identified as the associated transmission utility. The data does not specify a developer or a total capacity for the project. It has requested Network Resource Interconnection Service (NRIS), which would allow it to serve as a deliverable resource to network load within the MISO system.

The project entered the MISO queue on March 17, 2022, and remains in active status. Its proposed point of interconnection is the Eau Claire to A.S. King 345 kV transmission line. The project has reached the Generator Interconnection Agreement (GIA) phase of the MISO study process. It listed a proposed commercial operation date of June 6, 2024. Because that date has passed while the project is still in active queue status, the proposed timeline may have been superseded.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

WI

County

Dunn

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

NORTHERN STATES POWER COMPANY

Entity

MISO

Service Type

NRIS

Point of Interconnection

EAU CLAIRE (ENDPOINT A) TO AS KING (ENDPOINT B) 345 KV

Data Source

Live · MISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J1528
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.