Project MISO-J1514 — Project Summary

Queue ID
MISO-J1514
Capacity
100 MW
Technology
Solar
Status
active
Location
Mississippi, AR
Region
MISO
Developer
—
IA Status
Construction

MISO-J1514

MISO-J1514BetaActiveSolarMISOLBNL + Live

100 MW generation in Mississippi, AR · In queue since December 2021 · Proposed COD August 2023

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

100 MW

Capacity

1

Components

Solar

4y 10m

In Queue

Construction

IA Phase

COD target: 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 8m

Schedule

38 months past proposed COD

Study Phase

DPP-2020 South

In Study38%
Queue EntryDec 8, 2021

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

Done; post-GIA Under Construction; GIA

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-08-31

About

MISO-J1514 is a proposed 100 MW solar generation project located in Mississippi County, Arkansas. The development project consists of a single solar component with a capacity of 100 MW. It is planned to interconnect at the Driver 203kV Substation, within the service territory of Entergy Arkansas, and has requested Network Resource Interconnection Service (NRIS).

The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), which it entered on December 8, 2021. It was studied as part of the DPP-2020 South study cycle and currently holds an active status in the queue. Its interconnection agreement status is listed as "Construction." The project's proposed commercial operation date was August 31, 2023.

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

AR

County

Mississippi

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY ARKANSAS

Entity

MISO

Service Type

NRIS

Point of Interconnection

Driver 203kV Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ARKANSAS.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
EAI.DRVRSOL
POI Substation
Driver Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J1514
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.