MISO-J1390
150 MW generation in Bartholomew, IN · In queue since April 2019 · Proposed COD August 2022
150 MW
Capacity
1
Components
Solar
7y 6m
In Queue
Construction
IA Phase
COD target: 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 4m
Schedule
52 months past proposed COD
Study Phase
DPP-2019 Central
Interconnection request submitted to ISO/RTO
Done; post-GIA Under Construction; GIA
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-08-01
MISO-J1390 is a proposed 150 MW solar generation project located in Bartholomew County, Indiana. The project consists of a single solar component rated at 150 MW. No developer is identified in the available data, and the project has no recorded link to an existing operating plant in EIA records. Duke Energy Indiana is listed as the associated utility. The project would connect to the grid at the Gallagher Station – Columbus 230 kV Line Tap.
The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on April 29, 2019. It was studied in the DPP-2019 Central cycle and requested Network Resource Interconnection Service (NRIS). Its queue status is listed as active, and its interconnection agreement status is recorded as "Construction." The proposed commercial operation date is August 1, 2022.
Generated from interconnection queue and public data sources
Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
Bartholomew
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
DUKE ENERGY INDIANA
Entity
MISO
Service Type
NRIS
Point of Interconnection
Gallagher Station - Columbus 230 kV Line Tap
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- INDIANA.HUB
- Hub Confidence
- HIGH
- POI Substation
- Columbus St
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.