MISO-J1325
200 MW generation in Rock, MN · In queue since April 2019 · Proposed COD June 2022
200 MW
Capacity
1
Components
Solar
7y 6m
In Queue
Construction
IA Phase
Signed Aug 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 4m
Total Duration
3y 4m
Schedule
53 months past proposed COD
Study Phase
DPP-2019 West
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Done; post-GIA Under Construction; GIA
Project under construction
Typical: 12–24 months
Proposed COD: 2022-06-30
MISO-J1325 is a proposed 200 MW solar generation project located in Rock County, Minnesota. The project consists of a single solar component with a capacity of 200 MW. No developer or project name is identified in the available interconnection data. The project is designed to connect to the transmission system at the Magnolia 161 kV substation, within the service territory of transmission owner ITC Midwest.
The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on April 29, 2019, and was studied as part of the DPP-2019 West study cycle. It has requested Network Resource Interconnection Service (NRIS). Its queue status is listed as active. An interconnection agreement was executed on August 23, 2022, and the agreement status is recorded as "Construction." The proposed commercial operation date was June 30, 2022, which preceded the date of the interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MN
County
Rock
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ITC MIDWEST
Entity
MISO
Service Type
NRIS
Point of Interconnection
Magnolia 161 kV substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- AMMO.CENT
- POI Substation
- Magnolia Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.