MISO-J1314
100 MW generation in Polk, WI · In queue since April 2019 · Proposed COD June 2022
100 MW
Capacity
1
Components
Solar
7y 6m
In Queue
Construction
IA Phase
Signed Aug 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 4m
Total Duration
3y 4m
Schedule
53 months past proposed COD
Study Phase
DPP-2019 West
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Done; post-GIA Under Construction; GIA
Project under construction
Typical: 12–24 months
Proposed COD: 2022-06-30
MISO-J1314 is a proposed 100 MW solar generation project located in Polk County, Wisconsin. The development project consists of a single solar component with a capacity of 100 MW. It is planned to interconnect within the Midcontinent Independent System Operator (MISO) region at the Apple River 161 kV Substation, with Dairyland Power Cooperative identified as the associated transmission owner. No project name or developer has been publicly identified in the queue data.
The project entered the MISO interconnection queue on April 29, 2019, and was studied as part of the DPP-2019 West study cycle. It requested Network Resource Interconnection Service (NRIS) and remains in active status. Its interconnection agreement is dated August 26, 2022, and the agreement status is listed as "Construction." The project's proposed commercial operation date was June 30, 2022, which preceded the execution of its interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WI
County
Polk
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
DAIRYLAND POWER COOPERATIVE
Entity
MISO
Service Type
NRIS
Point of Interconnection
Apple River 161 kV Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Eagle River
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MISO-J1314Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.