MISO-J1202
68.4 MW hybrid in Randolph, IL · In queue since April 2019 · Proposed COD June 2021
68.4 MW
Capacity
1
Components
Solar
7y 6m
In Queue
IA Executed
IA Phase
Signed Dec 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
5y 8m
Total Duration
5y 8m
Schedule
65 months past proposed COD
Study Phase
DPP-2019 Central
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Done; post-GIA Not Started; GIA
Project under construction
Typical: 18–30 months
Proposed COD: 2021-06-15
MISO-J1202 is a proposed solar and battery storage hybrid development project located in Randolph County, Illinois. The project has a total capacity of 68.4 MW, all of which is attributed to its solar component in the interconnection data. Battery storage is listed as part of the project's technology, but no separate battery capacity is specified. The project is in the service territory of Ameren Illinois. Its proposed point of interconnection is the Baldwin Plant 345kV Switchyard at Baldwin Unit 2.
The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on April 25, 2019, and remains active. It was studied in the DPP-2019 Central study cycle and requested Network Resource Interconnection Service (NRIS). An interconnection agreement was executed on December 3, 2024. The project's proposed commercial operation date of June 15, 2021, predates the execution of that agreement.
Generated from interconnection queue and public data sources
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Randolph
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
NRIS
Point of Interconnection
Baldwin Plant 345kV Switchyard - Baldwin Unit 2
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- HIGH
- POI Substation
- Holly Plant Switchyard
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MISO-J1202Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.