MISO-J1115
200 MW generation in Macon, IL · In queue since March 2018 · Proposed COD September 2021
200 MW
Capacity
1
Components
Wind
8y 7m
In Queue
Construction
IA Phase
Signed Oct 2021
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 7m
Total Duration
3y 7m
Schedule
63 months past proposed COD
Study Phase
DPP-2018-APR Central
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Done; post-GIA Under Construction; GIA
Project under construction
Typical: 18–36 months
Proposed COD: 2021-09-01
MISO-J1115 is a proposed 200 MW wind generation project located in Macon County, Illinois. The development project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue, where it holds an active status. The project would connect to the transmission system at the Latham – Oreana 345 kV Line, within the service territory of Ameren Illinois. No developer has been publicly identified in the queue data.
The project entered the MISO queue on March 12, 2018, and was studied as part of the DPP-2018-APR Central study cycle. It requested Network Resource Interconnection Service (NRIS). Its proposed commercial operation date was September 1, 2021. The project's interconnection agreement status is listed as "Construction," with an agreement date of October 12, 2021, indicating that it has progressed beyond the study phase.
Generated from interconnection queue and public data sources
Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Macon
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMEREN ILLINOIS
Entity
MISO
Service Type
NRIS
Point of Interconnection
Latham - Oreana 345kV Line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MISO-J1115Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.