Project MISO-J1063 — Project Summary

Queue ID
MISO-J1063
Capacity
195 MW
Technology
Solar
Status
active
Location
Clinton, IN
Region
MISO
Developer
—
IA Status
Construction

MISO-J1063

MISO-J1063BetaActiveSolarMISOLBNL + Live

195 MW generation in Clinton, IN · In queue since March 2018 · Proposed COD October 2022

BA: MISOISO/RTO: MISONERC: RFCRC: MISO

195 MW

Capacity

1

Components

Solar

8y 7m

In Queue

Construction

IA Phase

Signed Mar 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4 years

IA → COD

7 months

Total Duration

4 years

Schedule

49 months past proposed COD

Study Phase

DPP-2018-APR Central

Construction38%
Queue EntryMar 12, 2018

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementMar 9, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Done; post-GIA Under Construction; GIA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2022-10-31

About

MISO-J1063 is a proposed 195 MW solar generation project located in Clinton County, Indiana. The development project consists of a single solar component with a capacity of 195 MW. It is planned to connect to the transmission system at the New London – Frankfort 230 kV Line Tap, within the service territory of Duke Energy Indiana. The project has requested Network Resource Interconnection Service (NRIS).

The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on March 12, 2018, and was studied as part of the DPP-2018-APR Central study cycle. Its interconnection agreement was executed on March 9, 2022, and its IA status is listed as "Construction." The project's proposed commercial operation date was October 31, 2022, and it remains listed as active in the queue.

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

IN

County

Clinton

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

DUKE ENERGY INDIANA

Entity

MISO

Service Type

NRIS

Point of Interconnection

New London - Frankfort 230kV Line Tap

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
INDIANA.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J1063
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.