Project MISO-J1007 — Project Summary

Queue ID
MISO-J1007
Capacity
200 MW
Technology
Solar
Status
active
Location
Crittenden, AR
Region
MISO
Developer
—
IA Status
Construction

MISO-J1007

MISO-J1007BetaActiveSolarMISOLBNL + Live

200 MW generation in Crittenden, AR · In queue since March 2018 · Proposed COD September 2021

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

200 MW

Capacity

1

Components

Solar

8y 7m

In Queue

Construction

IA Phase

Signed Aug 2020

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 5m

IA → COD

1y 1m

Total Duration

2y 5m

Schedule

63 months past proposed COD

Study Phase

DPP-2018-APR South

Construction38%
Queue EntryMar 12, 2018

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementAug 12, 2020

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Done; post-GIA Under Construction; GIA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2021-09-01

About

MISO-J1007 is a proposed 200 MW solar generation project located in Crittenden County, Arkansas. The project is listed in the interconnection queue of the Midcontinent Independent System Operator (MISO) within the service territory of Entergy Arkansas. It is designed as a standalone solar facility, with its full 200 MW of capacity consisting of solar generation. The project would connect to the grid at the Marion – Marked Tree 161 kV Line Tap, and it has requested Network Resource Interconnection Service (NRIS).

The project entered the MISO queue on March 12, 2018, and was studied in the DPP-2018-APR South cycle of MISO's Definitive Planning Phase. An interconnection agreement was executed on August 12, 2020, and the agreement's status is listed as "Construction." The project had a proposed commercial operation date of September 1, 2021. It remains in active status in the queue.

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

AR

County

Crittenden

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY ARKANSAS

Entity

MISO

Service Type

NRIS

Point of Interconnection

Marion - Marked Tree 161kV Line Tap

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ARKANSAS.HUB
Hub Confidence
HIGH
POI Substation
Marion

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-J1007