Bluejacket Solar
204.88 MW generation in Bureau, IL · In queue since November 2025 · Proposed COD December 2028
204.88 MW
Capacity
1
Components
Solar
1 year
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 1m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Entered MISO queue with interconnection study in progress
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of December 2028. No independent news or press releases found to validate or contradict this target date.
Developer: LBNL lists 'Hoosier Energy' as developer. This appears to be the operating entity name rather than a project-specific LLC. No news coverage found to confirm or provide additional detail on ownership structure.
Status: LBNL status shows 'active' with IA in progress. No news coverage found to indicate construction start, permitting milestones, or project advancement beyond queue filing.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Bluejacket Solar is a proposed 204.88 MW solar generation project in Bureau County, Illinois. The development project is being pursued by Hoosier Energy, which is also listed as the associated utility. The project consists of a single solar component totaling 204.88 MW. It would connect to the grid at the Bureau-Princeton 138kV point of interconnection and has requested Network Resource Interconnection Service (NRIS).
The project is listed as active in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0053. It entered the queue on November 6, 2025, and has a proposed commercial operation date of December 1, 2028. Its interconnection agreement status is recorded as in progress, though the specific study phase is not identified in the available data.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Bureau
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Hoosier Energy
Utility
Hoosier Energy
Entity
MISO
Service Type
NRIS
Point of Interconnection
Bureau-Princeton 138kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- ILLINOIS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Illinois Solar in Illinois growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
OE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
OE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.