Point Coupee
377 MW generation in Pointe Coupee Parish, LA · In queue since October 2025 · Proposed COD October 2028
377 MW
Capacity
1
Components
Gas
1y 1m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3 years
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- oilandgaswatch.org/facility/be900c9a-94a4-4b6c-9f12-1344f09210d8
- lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=KVNUxjJ5DGI%3D
- entergylouisiana.com/brightfuture/projects
Commercial operation date: No search result gives a post-filing COD or in-service target for Point Coupee. The LBNL proposed COD of 2028-10-01 is the only date available, so it is retained unverified.
Developer: The LBNL filing entity is Entergy Louisiana, LLC, which is the operating utility rather than a shell. The Oil & Gas Watch listing and the LPSC application also name Entergy Louisiana as the applicant for the Pointe Coupee Power Station / Point Coupee units.
Status: LBNL lists the project as active, and the LPSC filing and air permit application show it is still being pursued. No source indicates withdrawal, suspension or construction start.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Point Coupee (MISO-E0051) is a proposed natural gas-fired generation project in Pointe Coupee Parish, Louisiana, with a total capacity of 377 megawatts (MW). The development project is sponsored by Entergy Louisiana, LLC, which also serves as the interconnecting utility. It is designed to connect to the transmission system at the Big Cajun 500 kV point of interconnection.
The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on October 23, 2025, and is listed with an active status. It has requested Network Resource Interconnection Service (NRIS). Its interconnection agreement status is recorded as in progress, although the specific study phase is not identified. The proposed commercial operation date is October 1, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
LA
County
Pointe Coupee Parish
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Entergy Louisiana, LLC
Utility
Entergy Louisiana, LLC
Entity
MISO
Service Type
NRIS
Point of Interconnection
Big Cajun 500kv
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- LOUISIANA.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Louisiana in Louisiana growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
Entergy in Louisiana queue pipeline — 7 projects by technology and status
Structured data lookup for Entergy with rankings and aggregations.
Louisiana 1
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Louisiana 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.