Lakeover CCCT
820 MW generation in Hinds, MS · In queue since August 2025 · Proposed COD August 2028
820 MW
Capacity
1
Components
Gas
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3 years
Study Phase
ERAS Study Cycle 2
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-04
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- cdn.misoenergy.org/ERAS%20Interconnection%20Requests718481.pdf?v=20250925100448
- infrasure.ai/browse/owner/entergy
- interconnection.fyi/clusters/miso/eras%20study%20cycle%202
- gridalmanac.com/queue/states/mississippi
Commercial operation date: No news or press-release source gives a COD. The search hits are queue trackers and a MISO ERAS document, none stating a target date, so the LBNL proposed COD of 2028-08-04 stands unchallenged.
Developer: The LBNL filing entity is Entergy Mississippi, LLC, the regulated utility rather than a shell. Infrasure also lists Lakeover CCCT (820 MW gas) in Entergy's asset portfolio, so the two sources are consistent.
Status: LBNL lists the project as active, and the interconnection.fyi, GridAlmanac and Infrasure queue trackers all show it as Active. Nothing found indicates withdrawal or construction.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Lakeover CCCT is a proposed natural gas-fired generation project in Hinds County, Mississippi, with a total planned capacity of 820 megawatts (MW). Its name indicates a combined-cycle combustion turbine configuration. The project is being developed by Entergy Mississippi, LLC, which is also the interconnecting utility. It would connect to the transmission grid at the Green Acres 230 kV substation, a new point of interconnection.
The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0047. It entered the queue on August 6, 2025, and remains active. It has requested Network Resource Interconnection Service (NRIS) and is being evaluated in Cycle 2 of MISO's Expedited Resource Addition Study (ERAS). Its interconnection agreement status is listed as in progress, with the specific study stage unspecified. The proposed commercial operation date is August 4, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MS
County
Hinds
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Entergy Mississippi, LLC
Utility
Entergy Mississippi, LLC
Entity
MISO
Service Type
NRIS
Point of Interconnection
Green Acres 230kV (new)
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- LOUISIANA.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.