Entergy Louisiana LRZ 9 Generation Resource
770 MW generation in Calcasieu Parish, LA · In queue since August 2025 · Proposed COD August 2028
770 MW
Capacity
1
Components
Gas
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3 years
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-04
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- interconnection.fyi/project/miso-e0045
- entergy.com/news/entergy-louisiana-breaks-ground-on-new-state-of-the-art-generation-facilities-to-power-reliability-growth-and-innovation
Commercial operation date: Only the LBNL queue date (2028-08-04) exists. The interconnection.fyi listing (Aug 3, 2028) appears to be derived from the same queue data, so it is not an independent signal. No press release gives a project-specific COD.
Developer: The LBNL filing entity is Entergy Louisiana, LLC, the operating utility itself rather than a shell LLC. The interconnection.fyi listing names the same owner, and no conflicting developer appears.
Status: LBNL lists the project as active and non-operational. No source shows withdrawal, suspension, or a project-specific construction start.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Entergy Louisiana LRZ 9 Generation Resource is a proposed 770 MW natural gas-fired generation project located in Calcasieu Parish, Louisiana. The development project is being pursued by Entergy Louisiana, LLC, which also serves as the interconnecting utility. The project's name refers to Local Resource Zone 9 within the Midcontinent Independent System Operator (MISO) footprint. It is planned to connect to the grid at the new Nelson 230 kV Substation.
The project entered the MISO interconnection queue on August 28, 2025, under queue ID MISO-E0045, and it holds an active status. It has requested Network Resource Interconnection Service (NRIS). The proposed commercial operation date is August 4, 2028. Its interconnection agreement status is listed as in progress, though the specific study phase has not been identified.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
LA
County
Calcasieu Parish
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Entergy Louisiana, LLC
Utility
Entergy Louisiana, LLC
Entity
MISO
Service Type
NRIS
Point of Interconnection
Nelson 230kV Substation (New)
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- LOUISIANA.HUB
- Hub Confidence
- HIGH
- POI Substation
- Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Louisiana in Louisiana growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
Entergy in Louisiana queue pipeline — 7 projects by technology and status
Structured data lookup for Entergy with rankings and aggregations.
Louisiana 1
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.