Richland Parish generators (MISO-E0044) — Project Summary

Queue ID
MISO-E0044
Capacity
1640 MW
Technology
Gas
Status
active
Location
Richland Parish, LA
Region
MISO
Developer
Entergy Louisiana, LLC
IA Status
In Progress (unknown study)

Richland Parish generators

MISO-E0044BetaActiveGasMISOLBNL

1,640 MW generation in Richland Parish, LA · In queue since August 2025 · Proposed COD August 2028

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

1,640 MW

Capacity

1

Components

Gas

1y 3m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3 years

In Study38%
Queue EntryAug 28, 2025

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-08-04

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Aug 4, 2028
From queue filing
Developer in saved assessment
Entergy Louisiana
Sources agreed at research time
Status at research time
Active
Active in the MISO queue. Entergy broke ground in Dec 2025 on two gas plants in Richland Parish to serve Meta's Hyperion data center, and further expansion is being sought. The queue entry may not map exactly to those plants.
Financing
Not recorded

Milestones in this assessment

GroundbreakingDec 2025Latest in this assessment

Entergy began construction on two new gas plants in Richland Parish to power Meta's AI data center.

louisianaradionetwork.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. louisianaradionetwork.com/2025/12/02/44622/
  2. eenews.net/articles/meta-plans-7-new-gas-plants-to-power-massive-louisiana-data-center/
  3. nola.com/news/business/entergy-power-meta-ai-data-center/article_4509eaa2-45a1-4d28-9482-fa1c6bed80de.html
  4. interconnection.fyi/project/miso-e0044

Commercial operation date: The only COD in the sources is the LBNL proposed date of 2028-08-04, and aggregator pages such as interconnection.fyi repeat it. No news or press release gives a different in-service date, though construction began in December 2025.

Developer: The LBNL filer, Entergy Louisiana, LLC, is the operating utility building the plants, not a shell. News coverage names Entergy as the builder and Meta as the data-center customer driving the load.

Status: LBNL lists the project as active. The Louisiana Radio Network reports Entergy started construction on new gas plants in Richland Parish, which is consistent with an active project. I could not confirm that the 1,640 MW queue entry is exactly the plants now under construction.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Richland Parish generators are a proposed natural gas-fired generation project in Richland Parish, Louisiana, with a total planned capacity of 1,640 MW. The project is being developed by Entergy Louisiana, LLC, which is also the associated utility. It is designed to connect to the grid at the West Fork Creek 230kV Substation, a new substation planned as the project's point of interconnection.

The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0044, with a queue entry date of August 28, 2025. It has requested Network Resource Interconnection Service (NRIS) and holds an active status in the queue. Its interconnection agreement status is listed as in progress, though the specific study phase is not identified. The proposed commercial operation date is August 4, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

Richland Parish

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Entergy Louisiana, LLC

Utility

Entergy Louisiana, LLC

Entity

MISO

Service Type

NRIS

Point of Interconnection

West Fork Creek 230kV Substation (New)

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
HIGH
POI Substation
Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.