Schahfer CCGTs
2,739.8 MW generation in Jasper, IN · In queue since August 2025 · Proposed COD August 2028
2,739.8 MW
Capacity
1
Components
Gas
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3 years
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Jasper County rezoning approved for NIPSCO's $5.7B gas expansion (the exact date is not in the snippet).
insideindianabusiness.comResearch sources and reasoning (6 recorded sources)
low confidence at research time
- interconnection.fyi/project/miso-e0042
- wfyi.org/public-affairs/2025-09-25/nipsco-plans-large-natural-gas-plant-to-serve-data-centers-through-new-subsidiary
- rtoinsider.com/118712-nipsco-1st-genco-endeavor-feature-gas/
- utilitydive.com/news/nisource-nipsco-amazon-data-centers-indiana/806396/
- insideindianabusiness.com/articles/rezoning-request-approved-for-nipscos-5-7b-expansion-in-jasper-county
- iurc.portal.in.gov/_entity/sharepointdocumentlocation/504789a2-0295-f111-ab0f-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46322_GenCo_NIPSCO_Compliance%20Filing%20-%20Cost%20Reimbursement%20Agreement_08102026.pdf
Commercial operation date: None of the search snippets state a COD, so only the LBNL proposed COD of 2028-08-01 is available. The project is still moving (rezoning approved, IURC interconnection cost-reimbursement filing dated Aug 2026), but nothing contradicts that date.
Developer: LBNL lists NIPSCO, and the news (WFYI, RTO Insider, Utility Dive) describes the plant as a NIPSCO project served through a new GenCo subsidiary or affiliate. The IURC filing is titled 'GenCo_NIPSCO'. No dated transfer of ownership is documented, so I treat this as consistent with LBNL.
Status: LBNL and interconnection.fyi both show Active. The IURC filing says NIPSCO needs to spend about $31M as soon as possible on interconnection for the Schahfer CCGTs, so the project is advancing. No construction start is documented.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Schahfer CCGTs is a proposed natural gas-fired generation project in Jasper County, Indiana, with a total capacity of 2,739.8 MW. The development project is sponsored by NIPSCO, which is also the interconnecting utility. It is designed to connect to the grid at the Schahfer Generating Station point of interconnection. The project consists of a single gas generation component accounting for its full 2,739.8 MW capacity.
The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0042. It entered the queue on August 6, 2025, and remains in active status. It has requested Network Resource Interconnection Service (NRIS) and has a proposed commercial operation date of August 1, 2028. Its interconnection agreement status is listed as in progress, although the specific study phase is not identified in the available data.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
Jasper
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
NIPSCO
Utility
NIPSCO
Entity
MISO
Service Type
NRIS
Point of Interconnection
Schahfer Gen Sta
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- INDIANA.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.