Nobles BESS
313.92 MW storage in Nobles, MN · In queue since August 2025 · Proposed COD April 2028
313.92 MW
Capacity
1
Components
Battery
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-08
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
medium confidence at research time
- dglobe.com/news/local/xcel-energy-proposes-new-nobles-battery-energy-storage-project
- interconnection.fyi/project/miso-e0040
- puc.sd.gov/commission/commissionaction/10yearplan/Xcel2026.pdf
- article.wn.com/view/2026/09/22/Xcel_Energy_proposes_new_Nobles_Battery_Energy_Storage_proje/
Commercial operation date: No post-LBNL source gives an explicit COD. The interconnection.fyi aggregator repeats the LBNL/MISO date (April 7, 2028), which is not independent. Xcel's Nobles BESS appears in its 2026 SD 10-year plan, but the snippet gives no in-service date.
Developer: LBNL lists Xcel Energy. The Worthington Globe says Northern States Power Company, doing business as Xcel Energy, is proposing the project, so this is the same entity (the Xcel operating subsidiary).
Status: LBNL shows active and the local news describes the project as newly proposed, with no permit approval, groundbreaking or IA execution reported. Active is consistent with the evidence.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Nobles BESS is a proposed battery energy storage development project in Nobles County, Minnesota. Developed by Xcel Energy, which is also the associated utility, the project has a total capacity of 313.92 MW consisting entirely of battery storage. It is listed under queue ID MISO-E0040 and would connect to the grid at the Nobles County 345kV Substation.
The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), which it entered on August 6, 2025. Its status is active, and its proposed commercial operation date is April 8, 2028. The interconnection agreement status is listed as "In Progress," with the specific study phase unspecified in available records.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MN
County
Nobles
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Xcel Energy
Utility
Xcel Energy
Entity
MISO
Service Type
—
Point of Interconnection
Nobles County 345kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- NSP.NOBLES.WND
- POI Substation
- Nobles County Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Recent Battery Storage news signals
Summary analysis with parallel narrative sections and visualizations.
PSE Minnesota TX Storage
Summary analysis with parallel narrative sections and visualizations.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.