Nobles BESS (MISO-E0040) — Project Summary

Queue ID
MISO-E0040
Capacity
313.92 MW
Technology
Battery
Status
active
Location
Nobles, MN
Region
MISO
Developer
Xcel Energy
IA Status
In Progress (unknown study)

Nobles BESS

MISO-E0040BetaActiveBatteryMISOLBNL

313.92 MW storage in Nobles, MN · In queue since August 2025 · Proposed COD April 2028

BA: MISOISO/RTO: MISONERC: MRORC: MISO

313.92 MW

Capacity

1

Components

Battery

1y 3m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 8m

In Study38%
Queue EntryAug 6, 2025

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-08

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 8, 2028
From queue filing
Developer in saved assessment
Xcel Energy (Northern States Power Company)
Sources agreed at research time
Status at research time
Active
Active in the MISO queue. Xcel is in the permitting/proposal stage for a 300 MW / 1,200 MWh lithium-ion BESS on Xcel-owned land next to the Nobles Wind Farm and Substation in Reading, MN. No construction start is reported.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. dglobe.com/news/local/xcel-energy-proposes-new-nobles-battery-energy-storage-project
  2. interconnection.fyi/project/miso-e0040
  3. puc.sd.gov/commission/commissionaction/10yearplan/Xcel2026.pdf
  4. article.wn.com/view/2026/09/22/Xcel_Energy_proposes_new_Nobles_Battery_Energy_Storage_proje/

Commercial operation date: No post-LBNL source gives an explicit COD. The interconnection.fyi aggregator repeats the LBNL/MISO date (April 7, 2028), which is not independent. Xcel's Nobles BESS appears in its 2026 SD 10-year plan, but the snippet gives no in-service date.

Developer: LBNL lists Xcel Energy. The Worthington Globe says Northern States Power Company, doing business as Xcel Energy, is proposing the project, so this is the same entity (the Xcel operating subsidiary).

Status: LBNL shows active and the local news describes the project as newly proposed, with no permit approval, groundbreaking or IA execution reported. Active is consistent with the evidence.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Nobles BESS is a proposed battery energy storage development project in Nobles County, Minnesota. Developed by Xcel Energy, which is also the associated utility, the project has a total capacity of 313.92 MW consisting entirely of battery storage. It is listed under queue ID MISO-E0040 and would connect to the grid at the Nobles County 345kV Substation.

The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), which it entered on August 6, 2025. Its status is active, and its proposed commercial operation date is April 8, 2028. The interconnection agreement status is listed as "In Progress," with the specific study phase unspecified in available records.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MN

County

Nobles

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Xcel Energy

Utility

Xcel Energy

Entity

MISO

Service Type

—

Point of Interconnection

Nobles County 345kV Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
NSP.NOBLES.WND
POI Substation
Nobles County Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.