MISO-E0037
454.8 MW generation in Sheboygan, WI · In queue since August 2025 · Proposed COD October 2025
454.8 MW
Capacity
1
Components
Gas
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2 months
Schedule
14 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-10-02
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only the LBNL snapshot provides a COD (2025-10-02). No news or search findings were supplied to corroborate or contradict it. The date is only ~2 months after the queue date (2025-08-06), so it is likely a placeholder and unreliable for a 454.8 MW gas project.
Developer: LBNL lists Wisconsin Power and Light Company, an operating utility rather than a shell LLC. No other sources were available to confirm it or identify a parent such as Alliant Energy.
Status: LBNL status is 'active' and the IA is in progress. No contradicting information was provided.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
MISO-E0037 is a proposed natural gas-fired generation project in Sheboygan County, Wisconsin, with a total capacity of 454.8 MW. Wisconsin Power and Light Company (WPL) is both the developer and the associated utility. The project would connect to the transmission system at the Sheboygan Energy Center 345kV point of interconnection. It has requested Network Resource Interconnection Service (NRIS).
The project is listed as active in the Midcontinent Independent System Operator (MISO) interconnection queue, which it entered on August 6, 2025. Its proposed commercial operation date is October 2, 2025, less than two months after the queue entry date. The interconnection agreement status is recorded as "In Progress," with the specific study phase not identified in the available data.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WI
County
Sheboygan
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Wisconsin Power and Light Company (WPL)
Utility
Wisconsin Power and Light Company (WPL)
Entity
MISO
Service Type
NRIS
Point of Interconnection
Sheboygan Energy Center 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ALTE.BVRDAM
- POI Substation
- Center St
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MISO-E0037Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.