MISO-E0036
162 MW generation in Freeborn, MN · In queue since August 2025 · Proposed COD February 2028
162 MW
Capacity
1
Components
Wind
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 6m
Study Phase
ERAS Study Cycle 2
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-02-06
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Entered MISO queue with interconnection study in progress
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of February 2028. No independent news or research sources found to validate or contradict this date.
Developer: LBNL lists Wisconsin Power and Light Company (WPL), a subsidiary of Alliant Energy, as the developer. No news sources available to confirm current ownership or identify any shell LLC structure.
Status: LBNL queue status shows active with interconnection study in progress. No news coverage found to provide additional ground-truth status updates.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
MISO-E0036 is a proposed 162 MW wind generation project located in Freeborn County, Minnesota. The development project is being advanced by Wisconsin Power and Light Company (WPL), which is also listed as the associated utility. The project consists of a single wind component totaling 162 MW and is proposed to interconnect to the grid at the Freeborn 161kV Substation.
The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), which it entered on August 6, 2025, and its status is active. It has requested Network Resource Interconnection Service (NRIS) and is being evaluated in MISO's Expedited Resource Addition Study (ERAS) Study Cycle 2. Its interconnection agreement status is listed as in progress, with the specific study stage unknown. The proposed commercial operation date is February 6, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MN
County
Freeborn
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Wisconsin Power and Light Company (WPL)
Utility
Wisconsin Power and Light Company (WPL)
Entity
MISO
Service Type
NRIS
Point of Interconnection
Freeborn 161kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ALTW.FRBRN.WND
- POI Substation
- Freeborn Switching Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.