MISO-E0034
265 MW generation in Brookings, SD · In queue since August 2025 · Proposed COD November 2027
265 MW
Capacity
1
Components
Gas
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 3m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-11-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Proposed commercial operation date per MISO queue filing
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of November 2027. No independent news or research sources to validate or contradict this date.
Developer: Basin Electric Power Cooperative is listed as developer in LBNL filing. This is a known regional generation and transmission cooperative, not a shell LLC, so legal entity matches operating company.
Status: LBNL reports active queue status with interconnection study underway. No news coverage found to provide additional ground-truth validation of project progress.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
MISO-E0034 is a proposed 265 MW natural gas-fired generation project located in Brookings County, South Dakota. The development project is sponsored by Basin Electric Power Cooperative, which is also listed as the associated utility. The project consists of a single gas generation component with a capacity of 265 MW and is planned to interconnect at a point of interconnection identified as Brookings County.
The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), which it entered on August 12, 2025. It remains in active status and has requested Network Resource Interconnection Service (NRIS). The interconnection agreement process is listed as in progress, although the specific study phase has not been identified. The proposed commercial operation date is November 1, 2027.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
SD
County
Brookings
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Basin Electric Power Cooperative
Utility
Basin Electric Power Cooperative
Entity
MISO
Service Type
NRIS
Point of Interconnection
Brookings County
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Brookings County Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.