Mitchell BESS
526.68 MW storage in Lake, IN · In queue since August 2025 · Proposed COD August 2028
526.68 MW
Capacity
1
Components
Battery
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3 years
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only the LBNL snapshot gives a COD (proposed_cod 2028-08-01). None of the search results confirm a date for the Lake County, IN Mitchell BESS. The Texas 'Zeus Mitchell BESS' and the Virginia 'Mitchell Energy Center' results are different projects.
Developer: LBNL lists NIPSCO as the developer. The Energy-Storage.News article on a NIPSCO subsidiary's BESS deal with Amazon is related, but its snippet does not name Mitchell BESS, so it cannot confirm a parent or subsidiary relationship.
Status: LBNL shows the project as active and not operational. No search result contradicts this or adds ground-level detail for the Indiana project.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Mitchell BESS is a proposed battery energy storage development project in Lake County, Indiana, with a total capacity of 526.68 MW. The project is being developed by NIPSCO, which is also the associated utility. The project consists of a single battery storage component and is classified as a storage project. Its point of interconnection is identified as the Mitchell Gen. Station.
The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0033. It entered the queue on August 6, 2025, and remains in active status. The project has requested Network Resource Interconnection Service (NRIS) and has a proposed commercial operation date of August 1, 2028. Its interconnection agreement status is listed as in progress, although the specific study phase is not identified in the available data.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
Lake
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
NIPSCO
Utility
NIPSCO
Entity
MISO
Service Type
NRIS
Point of Interconnection
Mitchell Gen. Station
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- INDIANA.HUB
- Hub Confidence
- HIGH
- POI Substation
- Mitchell S. Edgerton Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Mitchell BESS
Data-driven briefing on Mitchell BESS — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.