Vicksburg CCCT
820 MW generation in Warren, MS · In queue since August 2025 · Proposed COD August 2027
820 MW
Capacity
1
Components
Gas
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2 years
Study Phase
ERAS Study Cycle 2
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-08-21
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- entergy.com/news/next-phase-of-superpower-mississippi-builds-highly-efficient-more-cost-effective-power-generation-source-in-vicksburg
- powermag.com/entergy-mississippi-adding-third-gas-fired-power-plant-to-superpower-strategy/
- jacksonadvocateonline.com/mayor-willis-thompson-entergys-1-2-billion-power-project-supercharges-jobs-and-growth-in-vicksburg/
- interconnection.fyi/project/miso-e0031
Commercial operation date: Only the LBNL/MISO queue date (2027-08-21, mirrored by interconnection.fyi) gives a specific COD. Entergy and press coverage give no dated target, and the Oct 2025 Jackson Advocate piece says only that 'construction will begin in the coming months, with completion expected in several years.' That wording hints the date could slip, but it is not enough to override the queue date.
Developer: The LBNL filing entity, Entergy Mississippi, LLC, is the actual utility operating company and not a shell. Entergy's own press release and POWER Magazine name it as the builder of the Vicksburg Advanced Power Station, which matches the queue project.
Status: LBNL status is active, and the Entergy announcement and local coverage show the project is moving forward. No source reports a groundbreaking, withdrawal, or suspension.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Vicksburg CCCT is a proposed 820 MW natural gas-fired generation project in Warren County, Mississippi. The development project is being pursued by Entergy Mississippi, LLC, which is also the interconnecting utility. As its name indicates, the project is planned as a combined-cycle combustion turbine (CCCT) facility. It would connect to the transmission system at the Baxter Wilson 115kV Substation.
The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0031. It entered the queue on August 6, 2025, and its status is active. The project has requested Network Resource Interconnection Service (NRIS) and is being evaluated in MISO's Expedited Resource Addition Study (ERAS) Cycle 2. Its interconnection agreement status is listed as in progress, though the specific study stage is not identified. The proposed commercial operation date is August 21, 2027.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MS
County
Warren
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Entergy Mississippi, LLC
Utility
Entergy Mississippi, LLC
Entity
MISO
Service Type
NRIS
Point of Interconnection
Baxter Wilson 115kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- LOUISIANA.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- EES.BXTRW5.ARR
- POI Substation
- Baxter Wilson Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.