Waterford 5 (MISO-E0029) — Project Summary

Queue ID
MISO-E0029
Capacity
478 MW
Technology
Gas
Status
active
Location
St. Charles Parish, LA
Region
MISO
Developer
Entergy Louisiana, LLC
IA Status
In Progress (unknown study)

Waterford 5

MISO-E0029BetaActiveGasMISOLBNL

478 MW generation in St. Charles Parish, LA · In queue since August 2025 · Proposed COD August 2028

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

478 MW

Capacity

1

Components

Gas

1y 3m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3 years

Study Phase

ERAS Study Cycle 2

In Study38%
Queue EntryAug 6, 2025

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-08-04

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2029
Differs from queue: Aug 4, 2028
Developer in saved assessment
Entergy Louisiana, LLC
Sources agreed at research time
Status at research time
Active
Active — Entergy Louisiana is in state permitting (LDEQ air/acid rain permit hearing, public comment through June 26, 2026) and LPSC proceedings. An advocacy site claims site work is already under way, but this is unverified. Public sources describe Waterford 5 as a 820 MW unit (EIA/Measured AI) versus 478 MW in LBNL.
Financing
Not recorded

Milestones in this assessment

COD targetJun 2029Latest in this assessment

Cleanview lists Waterford 5 (478 MW) as expected online June 2029.

cleanview.co
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/natural-gas-power-plants/louisiana
  2. cleanview.co/power-projects/planned/natural-gas-power-plants/louisiana/69184_WF5CT/waterford-5
  3. measuredai.substack.com/p/meta-gw-louisiana-data-center-cluster
  4. entergylouisiana.com/wp-content/uploads/2027-ELL-IRP-Data-Assumptions-Supplemental_2026_04_24_PUBLIC.pdf
  5. bayoublockade.com/
  6. interconnection.fyi/eia/plant/69184

Commercial operation date: Two independent post-LBNL sources put commercial operation in 2029: Cleanview lists Waterford 5 as 'Expected Online: June 2029' and Measured AI says 'Mid-to-late 2029 — Waterford 5 commercial operation date'. LBNL's 2028-08-04 is about 1 year earlier. Only the year is given as consensus because the two sources differ on month.

Developer: The LBNL filing entity is Entergy Louisiana, LLC, which is also the operating utility named in the community-meeting notices, the LPSC application and the IRP docket. It is not a shell LLC.

Status: The LBNL 'active' status matches the project's visible regulatory activity: the LDEQ permit hearing, the 2027 IRP docket listing Waterford 5 CCCT as a growth resource, and community meetings. No source confirms a formal construction start.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Waterford 5 is a proposed 478 MW natural gas-fired generation project in St. Charles Parish, Louisiana. The project is being developed by Entergy Louisiana, LLC, which is also the interconnecting utility. It is designed to connect to the grid at the Waterford 500kV Substation and has requested Network Resource Interconnection Service (NRIS).

The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0029. It entered the queue on August 6, 2025, and remains active. It is being evaluated in Cycle 2 of MISO's Expedited Resource Addition Study (ERAS) process. Its interconnection agreement status is listed as in progress, though the specific study stage is not identified. The proposed commercial operation date is August 4, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

St. Charles Parish

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Entergy Louisiana, LLC

Utility

Entergy Louisiana, LLC

Entity

MISO

Service Type

NRIS

Point of Interconnection

Waterford 500kV Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
HIGH
POI Substation
Waterford Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.