Red Butte Wind
456.84 MW generation in Morton, ND · In queue since August 2025 · Proposed COD February 2028
456.84 MW
Capacity
1
Components
Wind
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 6m
Study Phase
ERAS Study Cycle 2
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-02-25
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
medium confidence at research time
- project.nexteraenergyresources.com/red-butte-wind
- interconnection.fyi/project/miso-e0027
- interconnection.fyi/eia/plant/69659
- cleanview.co/power-projects/planned/wind-farms/north-dakota/69659_RBW/red-butte-wind
Commercial operation date: Only the LBNL/MISO queue date (2028-02-25, mirrored by interconnection.fyi) is tied to this 457 MW queue entry. The EIA-derived listings (interconnection.fyi EIA page, Cleanview) say 2027, but they describe a 202 MW unit and are one derivative source. The NextEra project page gives no COD.
Developer: The NextEra Energy Resources project site states that "Red Butte Wind is a subsidiary of NextEra Energy Resources, LLC." The LBNL filing entity is the project LLC. The site describes up to 226 MW in Oliver and Mercer counties, which does not match the 457 MW Morton County queue entry, so the link rests on the shared project name.
Status: LBNL shows active, and the NextEra page says the project is still "pending all necessary permits and approvals." No source reports withdrawal, an executed IA, or construction.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Red Butte Wind is a proposed 456.84 MW wind generation project in Morton County, North Dakota. The project is being developed by Red Butte Wind, LLC and consists of a single wind component. It would interconnect within the Midcontinent Independent System Operator (MISO) region at the Nelson Lake 230kV Substation, with Great River Energy (GRE) as the associated transmission utility.
The project entered the MISO interconnection queue on August 6, 2025, under queue ID MISO-E0027, and is currently listed as active. It has requested Network Resource Interconnection Service (NRIS) and is being evaluated in ERAS Study Cycle 2. Its interconnection agreement status is listed as in progress, with the specific study stage unspecified. The proposed commercial operation date is February 25, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
ND
County
Morton
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Red Butte Wind, LLC
Utility
Great River Energy (GRE)
Entity
MISO
Service Type
NRIS
Point of Interconnection
Nelson Lake 230kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Max 4 Wind
Data tables and metrics from the InfraSure database.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Wind queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
FPL Energy Oliver Wind I LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.