Amite Energy Storage II (MISO-E0024) — Project Summary

Queue ID
MISO-E0024
Capacity
207.9 MW
Technology
Battery
Status
active
Location
Tangipahoa Parish, LA
Region
MISO
Developer
NextEra Energy Resources Development, LLC
IA Status
In Progress (unknown study)

Amite Energy Storage II

MISO-E0024BetaActiveBatteryMISOLBNL

207.9 MW storage in Tangipahoa Parish, LA · In queue since August 2025 · Proposed COD February 2028

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

207.9 MW

Capacity

1

Components

Battery

1y 3m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 6m

Study Phase

ERAS Study Cycle 2

In Study38%
Queue EntryAug 6, 2025

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-02-25

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 25, 2028
From queue filing
Developer in saved assessment
NextEra Energy Resources
Filed as NextEra Energy Resources Development, LLC
Status at research time
Active
Active — in MISO interconnection queue, study phase ongoing as of queue snapshot
Financing
Not recorded

Milestones in this assessment

COD targetFeb 25, 2028Latest in this assessment

Proposed commercial operation date per MISO queue filing

lbnl_queue_snapshot
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. lbnl_queue_snapshot

Commercial operation date: Only LBNL queue data available with proposed COD of February 2028. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL filing entity is 'NextEra Energy Resources Development, LLC' which is the project development subsidiary. Parent operating company is NextEra Energy Resources, the competitive energy business of NextEra Energy Inc.

Status: LBNL reports 'active' status with interconnection study in progress. No news coverage found to indicate construction activity, permitting milestones, or status changes.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Amite Energy Storage II is a proposed 207.9 MW battery energy storage development project in Tangipahoa Parish, Louisiana. The project is being developed by NextEra Energy Resources Development, LLC and consists of a single battery storage component. It is proposed to interconnect at the Amite 115kV Substation, within the service territory of the utility DEMCO.

The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0024. It entered the queue on August 6, 2025, and holds an active status. Amite Energy Storage II has requested Network Resource Interconnection Service (NRIS) and is being evaluated in MISO's Expedited Resource Addition Study (ERAS) Study Cycle 2. Its interconnection agreement status is listed as in progress, with the specific study stage unspecified. The project has a proposed commercial operation date of February 25, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

Tangipahoa Parish

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

NextEra Energy Resources Development, LLC

Utility

DEMCO

Entity

MISO

Service Type

NRIS

Point of Interconnection

Amite 115kV Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
EES.AMITESO
POI Substation
Amite Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.