Project MISO-E0015 — Project Summary

Queue ID
MISO-E0015
Capacity
360 MW
Technology
Wind
Status
active
Location
Franklin, IA
Region
MISO
Developer
Interstate Power and Light Company (IPL)
IA Status
In Progress (unknown study)

MISO-E0015

MISO-E0015BetaActiveWindMISOLBNL

360 MW generation in Franklin, IA · In queue since August 2025 · Proposed COD February 2028

BA: MISOISO/RTO: MISONERC: MRORC: MISO

360 MW

Capacity

1

Components

Wind

1y 3m

In Queue

In Progress (unknown study)

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4 months

IA → COD

2y 2m

Total Duration

4 months

Study Phase

ERAS Study Cycle 1

Construction38%
Queue EntryAug 6, 2025

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementDec 22, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2028-02-06

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 6, 2028
From queue filing
Developer in saved assessment
Interstate Power and Light Company (IPL)
From queue filing
Status at research time
Active
Active in MISO queue; IA status shown as in progress (IA date 2025-12-22). No external confirmation of construction or permitting.
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only the LBNL snapshot provides a COD (proposed 2028-02-06). No news or live search findings were available to corroborate or contradict it.

Developer: Only LBNL names the developer (Interstate Power and Light Company, an Alliant Energy subsidiary). No external sources were available to confirm or contradict it, and the entity is an operating utility rather than a shell LLC.

Status: LBNL lists the status as active and not operational. No newer sources were available to refine it.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

MISO-E0015 is a proposed 360 MW wind generation project located in Franklin County, Iowa. The development project is being pursued by Interstate Power and Light Company (IPL), which is also listed as the associated utility. The project consists of a single wind component totaling 360 MW and is designed to connect to the transmission system at the Quinn-Blackhawk 345 kV point of interconnection.

The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on August 6, 2025, and currently holds an active status. It is being evaluated under ERAS Study Cycle 1 and has requested Network Resource Interconnection Service (NRIS). The project's interconnection agreement status is listed as in progress, with an associated date of December 22, 2025. The proposed commercial operation date is February 6, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IA

County

Franklin

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Interstate Power and Light Company (IPL)

Utility

Interstate Power and Light Company (IPL)

Entity

MISO

Service Type

NRIS

Point of Interconnection

Quinn-Blackhawk 345kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.