Red Oak Ridge Energy Center (MISO-E0012) — Project Summary

Queue ID
MISO-E0012
Capacity
1211.25 MW
Technology
Gas
Status
active
Location
Kenosha, WI
Region
MISO
Developer
Invenergy
IA Status
In Progress (unknown study)

Red Oak Ridge Energy Center

MISO-E0012BetaActiveGasMISOLBNL

1,211.25 MW generation in Kenosha, WI · In queue since August 2025 · Proposed COD December 2027

BA: MISOISO/RTO: MISONERC: MRORC: MISO

1,211.25 MW

Capacity

1

Components

Gas

1y 3m

In Queue

In Progress (unknown study)

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4 months

IA → COD

2 years

Total Duration

4 months

Study Phase

ERAS Study Cycle 1

Construction38%
Queue EntryAug 6, 2025

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementDec 1, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2027-12-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 2030
Differs from queue: Dec 1, 2027
Developer in saved assessment
Invenergy
Filed as Red Oak Ridge Energy Center LLC
Status at research time
Active
Active in queue. The Wisconsin PSC approved the CPCN in mid-October 2026 (Docket 9837-CE-100), so the project is permitted but not yet under construction.
Financing
Not recorded

Milestones in this assessment

Permit approvedOct 15, 2026

Wisconsin PSC approved Invenergy's two gas plants, including Red Oak Ridge in Kenosha County, to serve data centers.

jsonline.com
COD targetJun 2030Latest in this assessment

The $1.77B Red Oak Ridge plant is expected to open by June 2030.

bizjournals.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. bizjournals.com/milwaukee/news/2026/10/16/red-oak-ridge-kenosha-county-invenergy.html
  2. jsonline.com/story/money/business/energy/2026/10/15/wisconsin-regulators-approve-2-gas-plants-to-power-huge-data-centers/92270926007/
  3. psc.wi.gov/Pages/CommissionActions/CasePages/RedOakRidge.aspx
  4. naturalgasintel.com/news/wisconsin-greenlights-15-gw-of-natural-gas-fired-capacity/
  5. dailyreporter.com/2026/10/16/wisconsin-regulators-approve-billion-dollar-natural-gas-plants/

Commercial operation date: Business Journals (Oct 2026) reports Wisconsin regulators unanimously approved Invenergy's $1.77B plant, 'expected to open by June 2030', versus the LBNL proposed COD of 2027-12-01, a gap of about 2.5 years. The gap rounds to 3 years, but only one source gives the date, so the call is borderline.

Developer: The PSC case page states Red Oak Ridge Energy Center LLC is a wholly owned subsidiary of Invenergy Clean Power LLC. LBNL already lists Invenergy, and news and the project website confirm it.

Status: LBNL shows active, and the PSC approval in Oct 2026 is consistent with that. No source reports groundbreaking or construction, so 'Construction' is not supported.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Red Oak Ridge Energy Center is a proposed natural gas-fired generation project in Kenosha County, Wisconsin, developed by Invenergy. The development project has a total capacity of 1,211.25 MW and would connect to the transmission system within the service territory of Wisconsin Electric. Its proposed point of interconnection is the Paris-Lakeview 345 kV double circuit line. The project has requested Network Resource Interconnection Service (NRIS). It is also linked in federal data to an Energy Information Administration (EIA) plant record, Red Oak Ridge Energy Center LLC (EIA plant ID 70453).

The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on August 6, 2025, under queue ID MISO-E0012, and its status is active. It is being evaluated in MISO's Expedited Resource Addition Study (ERAS) Study Cycle 1. Its interconnection agreement status is listed as in progress, with an associated date of December 1, 2025. The project's proposed commercial operation date is December 1, 2027.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

WI

County

Kenosha

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Invenergy

Utility

Wisconsin Electric

Entity

MISO

Service Type

NRIS

Point of Interconnection

Paris-Lakeview 345kV double circuit

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.