Sandhill Energy Storage
213.52 MW storage in Olmsted, MN · In queue since August 2025 · Proposed COD September 2025
213.52 MW
Capacity
1
Components
Battery
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1 month
Schedule
14 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-09-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
MISO queue entry date - interconnection study phase initiated
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available showing proposed COD of September 2025. No independent news or press releases found to validate or contradict this date.
Developer: LBNL lists Xcel Energy as developer, which is the operating utility company itself (not a shell LLC). No news coverage found to confirm or provide additional detail.
Status: LBNL shows active queue status with interconnection study underway. Absence of press releases or news coverage suggests early-stage development with no major milestones announced yet.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Sandhill Energy Storage is a proposed battery energy storage development project located in Olmsted County, Minnesota. Developed by Xcel Energy, which is also the associated utility, the project has a total proposed capacity of 213.52 megawatts (MW), consisting entirely of battery storage. The project is planned to interconnect to the grid at the Byron 345 kV Substation.
The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0006, with a queue entry date of August 6, 2025, and an active status. It has requested Network Resource Interconnection Service (NRIS). The proposed commercial operation date is September 30, 2025, less than two months after the project entered the queue. Its interconnection agreement status is listed as in progress, with the specific study phase unknown.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MN
County
Olmsted
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Xcel Energy
Utility
Xcel Energy
Entity
MISO
Service Type
NRIS
Point of Interconnection
Byron 345kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Byron Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Recent Battery Storage news signals
Summary analysis with parallel narrative sections and visualizations.
PSE Minnesota TX Storage
Summary analysis with parallel narrative sections and visualizations.
Xcel Adams 1 Community Solar Array
Data-driven briefing on Xcel Energy — fleet, generation, financial, and news signals.
Xcel Adams 2 Community Solar Array
Data-driven briefing on Xcel Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.